Analisa Pengendalian Waktu Dan Biaya Proyek ITC Pole Fibre Optic Menggunakan Metode Earned Value

Studi Kasus: PT.LUM

Authors

  • Indra Bakti Institut Teknologi dan Bisnis Ahmad Dahlan
  • Mohamad Firdaus Universitas Indraprasta PGRI

DOI:

https://doi.org/10.62951/switch.v1i6.91

Keywords:

Earned Value Management, Project Control, Cost Variances, Schedule Variances, Project Performance, Fiber Optic Installation

Abstract

This research aims to analyze time and cost control on the ITC Pole Fiber Optic project managed by PT. LUM uses the Earned Value Management (EVM) method. EVM is an effective method for measuring project performance and progress by combining cost, time and completed work data. This case study uses secondary data obtained from project progress reports and PT financial data. LUM. Analysis is carried out to identify cost variance (CV) and schedule variance (SV) as well as cost performance index (CPI) and schedule performance index (Schedule Performance Index - SPI). The research results show that the ITC Pole Fiber Optic project experienced several deviations from the planned budget and schedule, with CV and SV showing negative values ​​at several project stages, indicating cost overruns and delays. The CPI and SPI values ​​obtained also provide an overview of the efficiency and effectiveness of project implementation. Based on these findings, several improvement steps are recommended to optimize time and cost control to improve project performance in the future. This research makes an important contribution in providing insight into the application of EVM in fiber optic installation projects and can be used as a reference in managing similar projects in the future.

Downloads

Download data is not yet available.

References

Agus Susanto, Elyzabeth Wijaya, R. D. P. S. M. S. K. M. E. D. E. F. A. P. K. A. D. S. M. I. S. A. M. F. L. O. M. Y. L. I. J. N. S. M. S. (2023). MSDM: Membentuk SDM Unggul dan Kompetitif. Media Sains Indonesia.

Ariana, I. K. A., & Lestari, D. A. (2023). Analisis kinerja proyek optimalisasi SPAM Gatak Kabupaten Sukoharjo dengan metode earned value. Journal of Integrated System, 6(1), 87–102.

Aris, A. A., Murthada, M., Hendra, M., Zainudin, Z., Hartini, H., Malik, M. A., & Firdaus, M. (2023). The role of management of human resources in enhancing the quality of schools. INNOVATIVE: Journal of Social Science Research, Universitas Pahlawan Tuanku Tambusai, 3(3), 11012–11023. https://doi.org/10.31004/innovative.v3i3.3436

Darwin, Damanik, Hermanto, B. D. S. F. A. G. A. S. F. A. A. S. W. M. F. A. S. Y. H. S. (2022). Ekonomi Makro. Jakarta: Media Sains Indonesia.

Dr. Yoyo Sudaryo, S. E., M. M. A. C. A. A., Dr. Nunung Ayu Sofiati, S. P., M. M., R. Adam Medidjati, S. E., & Dr. Ana Hadiana, M. E. S. (2019). Metode penelitian survei online dengan Google Forms. Andi Offset. Retrieved from https://books.google.co.id/books?id=u7ChDwAAQBAJ

Firdaus, M. (2020a). Implementation of activity based management to improve project quality in IT companies (Case study: PT. X). Jurnal Terapan Teknik Industri, 1(November), 109–118. https://doi.org/10.37373/jenius.v1i2.55

Firdaus, M. (2020b). Penerapan manajemen berbasis kegiatan untuk meningkatkan mutu proyek pada perusahaan IT (Studi kasus: PT. X). JENIUS: Jurnal Terapan Teknik Industri, 1(2), 109–118. Retrieved from http://jurnal.sttmcileungsi.ac.id/index.php/jenius/article/view/55

Firdaus, M. (2022). Implementasi IT project management dalam pembuatan sistem informasi monitoring pagu dan anggaran. Jurnal Teknologi Informasi (JUTECH), 3(2), 122–130.

Firdaus, M., & Bakti, I. (2023). Penerapan ERP frontaccounting pada sistem pembelian, penjualan dan stok barang di PT. Laba Usaha Mandiri. JUTECH, 4(Juni), 14–30.

Firdaus, M., Herliawan, A., & Bakti, I. (2023). PKM pengenalan pengelolaan marketplace kepada warga Komplek Kebersihan RT 13 RW 10 Cengkareng. Faedah: Jurnal Hasil Kegiatan Pengabdian Masyarakat Indonesia, 1(4), 205–212.

Ginting, J. V. B. G. (2020). Metode earned value pada pengendalian proyek pembangunan gedung sekolah SD Methodist-an Pancur Batu. ARBITRASE: Journal of Economics and Accounting, 1(1), 6–10.

Hartini, Hermin, Nainggolan, R. S. Y. I. W. T. H. E. L. M. A. R. I. P. S. A. S. A. O. U. H. M. F. M. A. T. R. (2022). Pengantar manajemen SDM di era modern. Media Sains Indonesia.

Indra, B., & Mohamad, F. (2023). Frontaccounting enterprise resource planning gratis untuk perusahaan kecil menengah (1st ed.; Rintho R. Rerung, Ed.). Jakarta: Media Sains Indonesia. Retrieved from https://store.medsan.co.id/detail/978-623-195-071-0-frontaccounting-enterprise-resource-planning-gratis-untuk-perusahaan-kecil-menengah

Jayathilaaka, R. D., Waidyasekara, K. G., & Sirimewan, D. C. (2022). The impact of material and labour cost variables on contractors budgeted cost. Proceedings The 10th World Construction Symposium, 10(1), 884–895.

Kusumastuti, A., Khoiron, A. M., Achmadi, T. A., & others. (2020). Metode penelitian kuantitatif. Deepublish.

Meliya, K. R., Sari, D. P., & Rafshanjani, M. A. (2022). Evaluasi pelaksanaan pembangunan proyek dengan menggunakan metode earned value. ETNIK: Jurnal Ekonomi Dan Teknik, 1(5), 374–382.

Muhammad, H. A., Acai, Sudirman, I. P. Y. R. R. S. N. Y. B. M. F. P. R. S. N. M. F. A. S. W. (2023). Human capital management (Teori dan aplikasi). Jakarta: Media Sains Indonesia.

Rachmad, Y. E., Dewantara, R., Junaidi, S., Firdaus, M., & Sulistianto, S. W. (2023). Mastering cloud computing (Foundations and applications programming) (1st ed.; Sepriano, Ed.). Jakarta: PT. Sonpedia Publishing Indonesia.

Sa’adah, N., Rijanto, T., & others. (2021). Evaluasi proyek pembangunan gedung stroke center (Paviliun Flamboyan) menggunakan metode critical path method (CPM) dan crashing. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 3(2), 55–62.

Vanhoucke, M., & de Koning, P. (2016). Stability of earned value management - Do project characteristics influence the stability moment of the cost and schedule performance index. The Journal of Modern Project Management, 4(1), 185.

Downloads

Published

2023-11-30

How to Cite

Indra Bakti, & Mohamad Firdaus. (2023). Analisa Pengendalian Waktu Dan Biaya Proyek ITC Pole Fibre Optic Menggunakan Metode Earned Value: Studi Kasus: PT.LUM. Switch : Jurnal Sains Dan Teknologi Informasi, 1(6), 01–13. https://doi.org/10.62951/switch.v1i6.91

Similar Articles

<< < 1 2 3 > >> 

You may also start an advanced similarity search for this article.