Reducing Cycle Time By Eliminating Waste In Refrigerator Factory Unloading Process

Authors

  • Dedy Khaerudin Universitas Bina Bangsa,Serang
  • Nirfison Nirfison Sekolah Tinggi Teknologi Mutu Muhammadiyah Tangerang
  • Rahman Soesilo Sekolah Tinggi Teknologi Mutu Muhammadiyah Tangerang

DOI:

https://doi.org/10.62951/bridge.v2i2.39

Keywords:

Lean, Forklift, Cycle Time, Takt time, Produktivity, Waste

Abstract

The lean approach is often used by manufacturing companies to increase productivity in the production area. In this case PT P, a manufacturing company that produces refrigerators, faces the same problem on the unloading process in the final assembly area. The unloading process is the operation to move the finished product from the production line and store it in the finished goods warehouse. Operators in the unloading area have tasks to unload finished products from conveyors which are connected directly from the assembly line and placing them on pallets. Due to the refrigerator is quite heavy a forklift has to use to move the full pallet to the finished goods warehouse which is located next to the unloading area. Once finished the forklift returns to the unloading area with the empty pallets and places them in the unloading area, to be refilled by the unloading operator. Based on the data taken, the cycle time in the unloading process was recorded to be varied and the highest was 33 seconds, exceeding the takt time that had been determined on the production line, which was 24 seconds. This means that there is waste that occurs in the unloading area. The long and unstable cycle time in the unloading process makes the production line disrupted because the conveyor often stops and causes productivity to drop. For this reason, it is necessary to analyze and improve the process with the Lean concept by reducing the existing waste, so that the cycle time becomes stable and smaller than the takt time.

Downloads

Download data is not yet available.

References

Woods T, 2005 Lean thinking246, 5 New York: Simon & Schuster.

Agrahari R S Dangle P A and Chandratre K V, 2015 Implementation of 5S methodology in the small scale industry: A case study Int. J. Sci. Technol. Res.4, 4 p. 180–187.

David N, 2014 Going lean95, 1124 Lean Enterprise Research Centre, Cardiff University.

Choomlucksana J Ongsaranakorn M and Suksabai P, 2015 Improving the Productivity of Sheet Metal Stamping Subassembly Area Using the Application of Lean Manufacturing Principles Procedia Manuf.2 p. 102–107.

Drucker P F, 2012 Management: Tasks, responsibilities, practices .

Greenberg L and A, 2005 Practical Guide to Productivity Measurement .

Heizer J and Render B, 2005 Manajemen Operasi edisi ketujuh .

Mali P, 1978 Improving Total Productivity .

Chandrayan B Solanki A K and Sharma R, 2019 Study of 5S lean technique: A review paper Int. J. Product. Qual. Manag.26, 4 p. 469–491.

Duran O Capaldo A and Acevedo P A D, 2017 Lean maintenance applied to improve maintenance efficiency in thermoelectric power plants Energies10, 10.

Gaspersz V and Fontana A, 2011 Lean Six Sigma for Manufacturing and Service Industries. Waste Elimination and Continuous Cost Reduction .

Ari Zaqi Al Faritsy S, 2018 Peningkatan Produktivitas Perusahaan Dengan Menggunakan Metode Six Sigma, Lean Dan Kaizen J. Tek. Ind.X.

Bartholdi J and Hankman S, 2014 Warehouse & distribution science Available line at/http//www. tli. gatech. edu/ … p. 299.

Juliana H and Handayani N U, 2016 Peningkatan Kapasitas Gudang Dengan Perancangan Layout Menggunakan Metode Class- Based Storage J@ti Undip J. Tek. Ind.11, 2 p. 113.

Gupta S and Jain S K, 2015 An application of 5S concept to organize the workplace at a scientific instruments manufacturing company Int. J. Lean Six Sigma7 p. 63–83.

Ishijima H Eliakimu E and Mshana J M, 2016 The “5S” approach to improve a working environment can reduce waiting time: Findings from hospitals in Northern Tanzania TQM J.28, 4 p. 664–680

Downloads

Published

2024-04-02

How to Cite

Dedy Khaerudin, Nirfison Nirfison, & Rahman Soesilo. (2024). Reducing Cycle Time By Eliminating Waste In Refrigerator Factory Unloading Process. Bridge : Jurnal Publikasi Sistem Informasi Dan Telekomunikasi, 2(2), 01–13. https://doi.org/10.62951/bridge.v2i2.39

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.